Salisbury Rd School

Client : Salisbury Road Primary School | Category : Install & Maintain
Contribution : Design-Build | Completion Time : 30 Days

A relocation of a 35 seat IT suite, requiring power, signal, network installation and large media displays for teaching,

    • Structured flood cabling
    • Network Rack and Patch Panel
    • IT Suite
    • Large Multi-use Displays
    • Aerial and Signal distribution
    • Consumer Unit
Ask about a similar project
  • slide
  • slide
  • slide
  • slide